A garage floor here is the low point of the lot, and it is poured as one. On most streets in this city the drive pitches down from the curb to the garage door, so the floor has to sit above the apron's swale and fall back out toward the door at a quarter inch to the foot, or the first November storm arrives inside the bay and stays there. The fall is set before the old floor is broken out, because the door track and the sill are fixed and the new slab has to land under both.
Saddleback Mission Viejo Concrete was founded in Mission Viejo in 2018 by Trevor Lindqvist, after 17 years on flatwork crews across south Orange County, and he runs every garage pour himself. The bays here were poured with the houses between the mid 1960s and the 1980s, on pads cut into the hill on one side and filled on the other, and a floor cracked along one straight line has the fill half under it. Both halves are probed and the base goes deeper over the one that gave.
The floor is built to the California Residential Code under a CSLB C-8 license, with liability insurance on every job. Because it is a slab under a roof, replacing it takes a permit from the City of Mission Viejo's Building Division, which we file and meet the inspector for. It is also the one slab on the lot the association never sees, so no submittal stands between estimate and pour. It carries a written workmanship guarantee against defects in how it was built.