Serving Mission Viejo, CA and surrounding areas.(657) 390-1824
Saddleback Mission Viejo Concrete

Concrete in Aliso Viejo, CA, on Pads That Are All the Same Age

Saddleback Mission Viejo Concrete pours patios, drives and walls on the terraced pads of Aliso Viejo, 7 miles west of our yard on La Paz Road, and writes the estimate at your door for nothing.

Google reviewsFacebook reviewsBetter Business Bureau reviews5.0 Stars Rated by our customers · Google, Facebook and the BBB
A new concrete patio behind a 1990s townhome in Aliso Viejo
A new concrete patio behind a 1990s townhome in Aliso Viejo

Why an Aliso Viejo Yard Sits on a Terrace

Aliso Viejo is terraced. The Mission Viejo Company cut the west side of the San Joaquin Hills into stepped pads through the 1980s and 1990s, and a yard here ends at a slope bank, not at a fence line.

The bank between one terrace and the next is fill, placed when the pad was made and held by an association slope that nobody may cut into. A patio poured out to the top of that bank sits on the loosest ground on the lot, and its outer edge drops as the fill takes on twenty winters of irrigation from the slope planting below. The house is on the cut side and stays put, so the crack opens along the line where the pad changes from one to the other, and it opens wider each spring.

So the pad is probed before it is priced, and where the fill side gives under the bar the base goes in deeper there and is compacted in lifts. The slab is poured 4 inches on 4 inches of gravel, jointed on a grid that puts one joint on the cut and fill line, and pitched back toward a drain rather than out over the bank, because water sent down an association slope becomes the association's complaint. Where a wall holds the edge, its footing goes into the cut and a pipe runs behind it.

The Work Aliso Viejo Asks For Thirty Years On

Aliso Viejo went up in one push from the middle of the 1980s to the end of the 1990s, so its first patios, walks and pool decks are wearing out together. The work here is replacement on a small terraced lot, under two sets of association rules.

Newly poured widened concrete driveway at a Mission Viejo tract home

Concrete Driveway Building

A driveway in Aliso Viejo is short and pitched, because the pads are terraced and the garage sits below or above the street. We pour 4 inches on compacted gravel, 5 at the low end, cut the joints across the fall, and file the association's sign-off before the apron comes out.

Newly poured concrete patio behind a Mission Viejo tract home

Concrete Patio Construction

The patio behind an Aliso Viejo house is the builder's 1990s slab, poured to the top of the fill and dropping at its outer edge. We break it out, dig the fill side deeper, pour 4 inches on gravel and pitch it back to a drain instead of out over the association slope.

Finished ashlar slate stamped patio behind a Mission Viejo tract home

Stamped Concrete Services

Stamped concrete in Aliso Viejo goes on the patio that has become the whole yard, where a plain slab would read as a parking pad. We cast an ashlar into 4 inches, color it through the mix to sit with the tract's stone, and seal it at 28 days once the slab has cured.

New broom-finished concrete entry walk climbing to a Mission Viejo door

Concrete Sidewalk Building

Walks in Aliso Viejo run from drive to door on a slope, and it is the steps that go first, heaving on fill nobody compacted. We take out the heaved panels, compact the ground, pour 4 inches jointed at each change of grade, and dowel the new panels into the ones that stay.

Newly poured sealed concrete garage floor in a Mission Viejo home

Garage Floor Concrete

A 1990s garage floor in Aliso Viejo is usually sound and low at the door, where the pitched drive sends rain in under it. We break out the front run, pour it with a fall to the door and a swale across the threshold, and trowel it flat enough to take a coating a month later.

Exposed aggregate walk with a smooth border at a Mission Viejo home

Decorative Concrete

Exposed aggregate suits an Aliso Viejo pool deck, because the stone gives wet feet a grip and a light matrix reads cooler in August than a colored slab. We seed the stone into the pour, wash it out the same afternoon and seal it once cured, with an expansion joint at the coping.

New concrete retaining wall holding a rear slope at a Mission Viejo home

Concrete Retaining Walls

A retaining wall in Aliso Viejo holds the edge of a terrace where the yard meets an association slope, and it is what most of our calls here are about. We dig the footing into the cut side, set rock and a pipe behind the stem, pour it in a day and permit anything over 4 feet.

New polished concrete floor inside an addition at a Mission Viejo home

Concrete Floor Installation

Interior slabs in Aliso Viejo are the garage turned into a room and the small addition a terraced lot has space for. We pour over a vapor barrier on gravel, dowel the new footing to the old where the inspector can see it, and trowel the floor flat enough for tile or plank.

Show All Concrete Services

The Saddleback Mission Viejo Concrete crew mid-pour at a home in the Mission Viejo area

Aliso Viejo Was Built Before It Was a City

Our yard on La Paz Road is 7 miles east along Alicia Parkway, so a crew is in Aliso Viejo inside 20 minutes. The city incorporated in 2001, after most of its houses were standing, and plans go to the City of Aliso Viejo building counter at City Hall on Journey. Nearly every lot also sits under the Aliso Viejo Community Association and, often, a smaller association for its own tract, and a change seen from the street goes to both. We write that submittal with the estimate.

The tracts either side of Aliso Creek Road and Aliso Viejo Parkway are the city's middle age, detached houses of the late 1980s and 1990s on lots where a barrow fits down the side yard and a mixer does not. Laguna Audubon on the east looks over Aliso Creek, and Glenwood went in last, around the golf course, in the 2000s. The townhome clusters off Pacific Park Drive have a patio the width of the unit and a gate onto a shared drive, and that gate is where the concrete comes in.

The ground is the same clay-bearing siltstone as Mission Viejo, cut and filled into steps, and the water off the pads runs east to Aliso Creek or west into Wood Canyon, so a yard drains one way or the other and rarely to the street. The 73 toll road cuts the city in two and puts a pump truck on either side inside 5 minutes. The marine layer reaches this far in May and June, which keeps a morning pour cool and gives the finish an hour more than Mission Viejo gets.

How an Aliso Viejo Job Is Sequenced

Four stages on one crew, with the two association reviews started the day the estimate is signed, because on a terraced lot the reviews take longer than the pour. Nothing is priced until the pad has been probed.

1

Measure and probe

Trevor Lindqvist measures the slab, probes the pad along the cut and fill line, checks where the bank drains and writes the figure on site.

2

Two reviews, one packet

We send one drawing to the Aliso Viejo Community Association and to your tract's own committee, and file with the city if a wall is in it.

3

Break-out and base

The old slab is broken out and barrowed through the side gate, soft fill is dug and replaced, and 4 inches of gravel is compacted in lifts.

4

Pour, cut and cure

The pour is one morning, the joints are cut that afternoon with one on the fill line, and the slab is kept wet for 7 days, cars off for 7 too.

A Free Measured Estimate in Aliso Viejo

Call or send the form and you hear back within 1 business day. The visit is free, the estimate is itemized and handed over before we leave, and we are in Aliso Viejo most weeks, on one terrace or another.

Request a Free Estimate

Written on site · No obligation

By submitting, you agree to our disclosure and consent terms, including being contacted by Saddleback Mission Viejo Concrete.

Reviews

What Aliso Viejo Homeowners Say After the Job

Reviews left on Google, Facebook and the BBB by homeowners across the towns we work from Mission Viejo. Aliso Viejo is one of them, and the pads behind these reviews are the ones described above.

Google review

“Our driveway in Aegean Hills had dropped two inches on the fill side of the pad. They probed it, found the soft half, dug it deeper and packed the base in lifts. They poured 720 square feet at 5 inches, cut the joints across the slope that afternoon, and two winters on nothing has moved.”

Facebook review

“The wall holding our back slope in Laguna Niguel leaned a little more every winter. They took it down, dug the footing 18 inches into hard ground, set drain rock and a pipe behind the new wall and poured it in a day. The first storm since ran clear out of the drain, not over the top.”

BBB review

“Our pool deck in Lake Forest was the original 1990s one and had lifted at the coping. They cut it out, set an expansion joint around the pool, poured 480 square feet with a salt finish and had it walkable in two days. Bare feet in August and it stays cool enough to stand on.”

Dana W. of Lake ForestPool deck · BBB · 2026

Questions Aliso Viejo Owners Ask

What we are asked on an Aliso Viejo step before a job is booked, on what moves the estimate on a terraced lot, who has to approve it, how far we come and what the slope bank behind the yard means for a slab.

(657) 390-1824
  • What moves the cost of a patio in Aliso Viejo?

    The bank at the back of the lot, before the size of the slab. A patio that runs to the top of an association slope needs the fill side of the pad dug deeper and the slab pitched back to a drain, and a wall along that edge is a second job with a footing and a pipe. After that it is the tear-out of the old slab. Every estimate is measured and written on site, with the pad probed before a number goes on paper.

  • Who has to approve concrete work in Aliso Viejo?

    The Aliso Viejo Community Association for anything seen from a street or a common area, your own tract's committee where there is one, and the city for a wall over 4 feet or a slab under a roof. A flat patio inside your fence needs no permit, because the California Residential Code exempts it, but it may still need the association's signature. We write all of the submittals and file them with the estimate.

  • How far is Aliso Viejo from your yard in Mission Viejo?

    About 7 miles, out Alicia Parkway, and under 20 minutes at 6 in the morning. The crew is on your street before the school run and the mixer is ordered for 8, so a pour is finished and the joints are cut before the afternoon breeze up the canyon starts drying the surface. A second day in Aliso Viejo is booked back to back with the first, not a week later.

  • Can I pour a patio out to the slope behind my Aliso Viejo yard?

    Not to the top of the bank. The slope behind most Aliso Viejo yards is association property, and the top of it is where the fill is loosest, so a slab carried to the edge is a slab that drops there. We stop the pour short of the bank, pitch it back toward the house to a drain, and where the yard needs a level edge we pour a low wall on a footing dug into firm ground, with a pipe behind it.

  • How long is a patio job on site in Aliso Viejo?

    Three days on site for most, because everything comes in and goes out through a side gate. The old slab is broken and barrowed out on the first day, the fill is dug and the base compacted on the second, and the pour is the third morning with the joints cut that afternoon. Walk on it the next day and keep furniture off it for a week. The association review is the only thing that adds to that, so we file it first.

  • Which towns next to Aliso Viejo do you also cover?

    Laguna Niguel, Laguna Hills and Laguna Beach, which border it, and Laguna Woods and Lake Forest beyond them, all from the same yard on La Paz Road. Wood Canyon is parkland, so there is no lot on the west side to be on the wrong side of. If your street sits on the Laguna Niguel line along Aliso Creek, call and we will say which page is yours before anyone drives out.

The Towns Around Aliso Viejo

Aliso Viejo meets Laguna Hills to the north, Laguna Niguel across Aliso Creek and Laguna Beach through the wilderness park, and we cover all three from La Paz Road. If your street runs along one of those lines, the page next door may be yours.

Show All Areas We Serve

Map showing Saddleback Mission Viejo Concrete in Mission ViejoOpen the Mission Viejo Office in Google Maps
Saddleback Mission Viejo Concrete

Need Concrete Work Done in Aliso Viejo?

Send the form and we call back within 1 business day to book the visit. The estimate is free and written on site, and every job carries a written workmanship guarantee.